
The Preston Colliery Werris Creek
The Werris Creek Colliery developed by the Preston Iron Coal and Coke Company was located around three kilometres south of the town and is now part of the present day Werris Creek (Whitehaven) Mine.
In 1925 at a spot where an outcrop of coal was visible a tunnel was driven 45 metres into the ground at a slope of 60 degrees striking a three and a half metre seam of good quality coal. This marked the beginning of the Werris Creek Colliery, tapping into the rich reserves of an isolated basin of coal to the south of the township.
The main tunnel of the mine extended to a length of 366 metres from the entry point running west and had bi-lateral tunnels branching off, especially to the north.
In the early days of the Colliery the work was very labour intensive, the coal being loaded into skips by shovel and wheeled to where pit ponies then hauled the load to a location where it could be brought to the surface by steel cables. This method usually produced an average of 35 to 40 tonnes daily.
The availability of mechanical loaders increased production to around 100 tonnes a day.
As the Colliery developed, a branch railway line was built from the mine to the New South Wales Govern-ment railways main line and was completed in 1929. The Colliery branch line was 825 metres in length and crossed the Werris Creek Quirindi Road, climbing the grade up to the Colliery. Around 20,000 tonnes of coal was mined annually until the early 1950’s when production dropped to around 11,000 tonnes.
The large coal was sold to the NSW Government Railway Department to fuel the steam locomotives. Much of the coal was railed to and used at the Werris Creek Locomotive Depot. The small coal was railed to Tamworth for the local power station.
Small amounts of coal were used locally for domestic purposes being delivered by motor vehicles.
During 1937 Mr I. H. ‘Doc’ Thomas was appointed as manager of the Colliery, which was owned by members of the Thomas family. Mr Thomas continued in this role until the closure of the mine.
The mine was not immune to industrial problems, with a major dispute in 1940 bringing the coal industry to a standstill. Though impacted by the strike the Werris Creek Colliery guaranteed to continue coal supply to Tamworth Municipal Council for electricity supply as well as Tamworth and Quirindi Hospitals.
With the phasing out of steam trains and the dieselisation of the rail network in the 1960’s, demand for coal dwindled.
The lack of replace-ment markets meant the Colliery became unviable and closed in 1963. The Preston Colliery was small in comparison with other collieries in NSW but is estimated to have produced over one million tonnes of high grade coal during operation.
The enterprise was an important contributor to the economy of Werris Creek and provided employment for more than 50 men over the life of the mine.


